Job Special Provision
Job:
Title:
General - Federal
Name:
FEDERAL
ID Number:
JSP-08-02
Accountable Division:
Design
First Effective Bid Opening Date:
08/2007
Last Effective Bid Opening Date:
09/2009
Revision Date:
09/11/2009
Explanatory Notes:
09/17/01 - Revised for new effective dates of General Specifications, Supplemental Specifications and Standard Plans. (A)
10/24/01 - Revised for new wage rate (General Wage Order 45). (A1)
01/08/02 - Revised for new effective dates of General Specifications, Supplemental Specifications and Standard Plans. (B)
05/14/02 - MoDOT is eliminating paper subscriptions, effective June 30, 2002. As such, reference to printed subscriptions in Sec 1.2 has been removed. Revised for new effective dates of General Specifications, Supplemental Specifications and Standard Plans. Section 1.3 was eliminated by incorporating its references to the supplemental bidding documents into Section 1.2. Other portions of Section 1.3 pertaining to wage rates, specifications and supplemental plans were incorporated into Section 1.1. (C)
07/09/02 - Revised for new State Wage Rates effective 7/30/02. (C1)
08/06/02 - Revised a lot of wording to help get across intended meaning. (C2)
12/17/02 - Revised for new effective date of the Standard Plans. (D)
01/13/03 - Revised for new effective date of the Standard Plans. (A)
06/05/03 - Revsed for new Federal Wage Rates effective 7/01/03 (B)
12/08/03 - Revised for new effective date of the Standard Plans (A)
05/24/04 - Made revisions to conform with the Performance Specification effective 07/2004 (B)
07/26/04 - Revised last effective date.
11/04/04 - Updated the new state wage rates (C).
11/08/04 -
Updated the effective date for the General Provisions & Supplemental Specifications (D).
02/04/05 -
Updated the effective date for the General Provisions & Supplemental Specifications (B).
05/24/05 -
Established a new effective date for the Supplemental to the MO Standard Plans (C).
07/07/05 -
Established a new state wage rates effective 07/30/05 (C1)
10/12/05 - Established a new effective date for the Supplemental to the MO Standard Plans, and the General Provisions and Supplemental Specifications (Blue Pack) (D).
11/04/05 - Established a new effective date for the Supplemental to the MO Standard Plans, and the General Provisions and Supplemental Specifications (Blue Pack) (D1).
02/14/06 - Revised for new effective date of General Provisions, Supplemental Specifications, and Standard Plans (A)
03/14/06 - Established a last effective bid opening date. Will be revised for new effective date of General Provisions, Supplemental Specifications, and Standard Plans (A)
03/15/06 - Revised for new effective date of General Provisions, Supplemental Specifications, and Standard Plans (B)
04/18/2006 - Revised for new effective date of General Provisions, Supplemental Specifications, and Standard Plans (B1)
05/23/2006 - Revised to remove dates for supplemental bidding documents and referenced that the respective bidding documents could be found on the internet.(C)
10/06/2006 - Revised for new effective date Standard Plans (D).
10/06/2006 - Revised for new Supplemental Specifications reference (D1)
10/05/2007 - Previously DSP-06-02D1. Revision due to new naming convention for JSPs.
08/11/2006 - Revised for new effective date Standard Plans
09/11/09 - Provided a last effective bid opening date.
Units:
Dual
File Attachments:
Section:
0107 - Legal Relations and Responsibility to the Public
GENERAL - FEDERAL JSP-08-02
1.0 Description.
The Federal Government is participating in the cost of construction of this project. All applicable Federal laws, and the regulations made pursuant to such laws, shall be observed by the contractor, and the work will be subject to the inspection of the appropriate Federal Agency in the same manner as provided in Sec 105.10 of the Missouri Standard Specifications for Highway Construction with all revisions applicable to this bid and contract.
1.1
This contract requires payment of the prevailing hourly rate of wages for each craft or type of work required to execute the contract as determined by the Missouri Department of Labor and Industrial Relations, and requires adherence to a schedule of minimum wages as determined by the United States Department of Labor. For work performed anywhere on this project, the contractor and the contractor’s subcontractors shall pay the higher of these two applicable wage rates. State Wage Rates, Information on the Required Federal Aid Provisions, and the current Federal Wage Rates are available on the Missouri Department of Transportation web page at www.modot.mo.gov under "Business With MoDOT". Effective Wage Rates will be posted 10 days prior to the applicable bid opening. These supplemental bidding documents have important legal consequences. It shall be conclusively presumed that they are in the bidder's possession, and they have been reviewed and used by the bidder in the preparation of any bid submitted on this project.
1.2
The following documents are available on the Missouri Department of Transportation web page at www.modot.mo.gov under "Business With MoDOT" “Standards and Specifications”. The effective version shall be determined by the letting date of the project.
General Provisions & Supplemental Specifications
Supplemental Plans to July 2008 Missouri Std. Plans
For Highway Construction
These supplemental bidding documents contain all current revisions to the bound printed versions and have important legal consequences. It shall be conclusively presumed that they are in the bidder's possession, and they have been reviewed and used by the bidder in the preparation of any bid submitted on this project.